How do I prep my ground to lay pavers?

To do this correctly, you will need two products. First, you will need to apply #10 limestone 2 inches thick as a base. It must be packed in using a tamper. Lay your stone and then lay a minimum of 1 inch red sand to level it. Natural stones are not consistently the same thickness, thus the red sand helps makes it level.

How many feet will a pallet of stone cover?

The majority of stone at our lots cover approximately 100 square feet (or linear feet). If you using the stone to outline a flowerbed, etc. you will need to measure your linear feet for the project. A pallet of stone covers 100 feet (if you want to lay 3 stones high, 33 feet will be covered with 1 pallet; 2 stones high, 50 feet).